PARTS DESCRIPTIONS

SFU Series Pulsation Dampener Assembly

SFU Series

  1. SFU o-ring
  2. SFU wing nut
  3. Dust cap
  4. Loading valve
  5. Bleeder valve
  6. Cartridge
  7. Case
SFV Series Pulsation Dampener Assembly

SFV & SFVM Series

  1. 6″ or 8″ suction gasket
  2. 6″ or 8″ grooved coupling
  3. Dust cap
  4. Loading valve
  5. Bleeder valve
  6. Cartridge
  7. Case
SFT Series Series Pulsation Dampener Assembly

SFT Series

  1. HPG-1 gasket (Nitrile or EPDM)
  2. Dust cap
  3. Loading valve
  4. Bleeder valve
  5. Cartridge
  6. Case
SFM Series Pulsation Dampener Assembly

SFM Series

  1. SFM o-rings (2 required)
  2. SFM wingnut
  3. Dust cap
  4. Loading valve
  5. Bleeder valve
  6. Cartridge
  7. Case
  8. SFM wingnut screw

SUCTION CHARGING INSTRUCTIONS

CHARGE TO 80%- 90% OF SUCTION PRESSURE OR THE MAXIMUM CHARGE PRESSURE OF THE CARTRIDGE, WHICHEVER IS LESS. THIS IS ONLY AN APPROXIMATION.

(YOU MAY FIND IT NECESSARY TO DECREASE THE PRESSURE IN THE SUCTION CARTRIDGE TO ACHIEVE OPTIMUM PUMP PERFORMANCE.)

Suction Charging Instructions Drawing
  1. Shut down pump and relieve line pressure from discharge side before closing suction valve. After discharge line is relieved of pressure, close suction line valve and drain suction line.
  2. Open bleeder valve ’A’.
  3. Remove loading valve protector cap ’B’.
  4. Remove cap from loading valve ’C’.
  5. Loosen safety nut ’D’ three full turns.
  6. Using NITROGEN ONLY, charge the cartridge through loading valve ’C’ to the recommended operating pressure (90% of suction pressure). (DO NOT EXCEED MAXIMUM CARTRIDGE CHARGE PRESSURE).
  7. Tighten safety nut ’D’ on loading valve ’C’.
  8. Replace loading valve protector cap ’B’
  9. Open suction valve. When air from bleeder valve ’A’ is evacuated, close bleeder valve ’A’.

DISCHARGE CHARGING INSTRUCTIONS

  1. Shut down pump and relieve line pressure.
  2. Open bleeder valve ’A’.
  3. Remove loading valve protector cap ’B’.
  4. Remove cap from loading valve ’C’.
  5. Loosen safety nut ’D’ three full turns.
  6. Using NITROGEN ONLY charge the cartridge through loading valve ’C’ to correct charge pressure (use chart below).
    NOTE: DO NOT EXCEED MAXIMUM CARTRIDGE CHARGE PRESSURE (ON CASE LABEL).
    Discharge Operating Pressure Table
  7. Tighten safety nut ’D’ on loading valve ’C’ and replace cap.
  8. Replace loading valve protector cap ’B’.
  9. Open suction valve. When air from bleeder valve ’A’ is evacuated, close bleeder valve ’A’.
Suction Charging Instructions Drawing

NITROGEN CHARGING ASSEMBLY

WARNING

THE USE OF ANY GAS OTHER THAN NITROGEN IS EXTREMELY DANGEROUS.

NEVER ATTEMPT TO CHARGE OR PRE-CHARGE A CARTRIDGE OUTSIDE OF THE PULSATION STABILIZER CASE.

FOR PROPER CHARGING PROCEDURES REFER TO THE SUCTION OR DISCHARGE CHARGING GUIDE.

Nitrogen Charging Assembly

TYPICAL INSTALLATIONS

Discharge Pulsation Dampener and Suction Pulsation Dampener with Off-Side Discharge Mounting
Plunger Pump Stabilizers
Piston Pump Stabilizers
In-line Pump with Suction Stabilizer and Discharge Stabilizer

Contact Us